InTimeCertified talent
Non-IT vertical · live

Construction & Energy talentcertified before you meet them.

The AI and energy buildout has made skilled-trade and engineering availability a site-selection constraint — projects now get built where the labor is. With data-center construction spend surpassing $52B in 2026 and a renewable-energy wave on top of it, we place the electrical, power, and commissioning talent that gets these projects to the finish line.

$52B+ data-center construction in 2026Transcripts on every profile3 profiles, not 200
identity redacted · revealed at interviewElectrical / Power EngineerNon-IT · Construction & Energy Certified · Grade A№ 0184 · verify in 60 secScreened liveJul 10 · 47 minExperience9 yrs · field engAvailablein 2 weeksPE licenseData-center MEPCommissioning
Screened live47 min · a practitioner
Slate readyin 2 days
profiles illustrative, the format exact — identity is revealed at interview, never before
$52B+
2026 data-center construction spend
349,000
Net new construction workers needed in 2026
17%
Americas data-center CAGR
86 GW
New US power capacity expected in 2026
The Construction & Energy roles we place

Pick the role. Meet your three.

How we screen this market

Domain-deep, evidence-first.

Project-typed

We match by project type — data center, grid, or renewables — where the experience is non-transferable.

Licensed and credentialed

We verify PE licensure and the commissioning experience that's now a hard constraint on schedules.

Speed where it decides projects

Because labor availability dictates where projects get built, we move on it accordingly.

PE licenseData-center MEPCommissioning (Cx)Power distributionControls / BMSRenewable & gridHigh-voltageCritical infrastructure
Where we place Construction & Energy talent
Fair questions

Before you brief us

Do you staff data-center construction?
Yes — data-center electrical, power, and commissioning talent is the hottest part of this vertical and our focus within it.
Engineers or trades?
Both, with emphasis on the higher-margin engineering and commissioning roles where scarcity is most acute.
Renewable energy too?
Yes — solar, wind, and grid-modernization talent, riding the same structural shortage as data centers.
The guarantee

Three certified Construction & Energy specialists. Transcripts attached.

Brief us today; the slate lands within two days. If we don't have three great fits, we say so — and tell you when we will.

INTIME ESOLUTIONS · EST 2024 · US · CA · IN